BRA Metodik - Balanserad ruttanpassning för mjölkrundetåg i JIT-organiserade monteringsavsnitt

Typ
Examensarbete på grundnivå
Program
Economics and manufacturing technology (180 hp)
Publicerad
2014
Författare
Andersson, Carl
Kype, Björn
Modellbyggare
Tidskriftstitel
ISSN
Volymtitel
Utgivare
Sammanfattning
E2014:043, This thesis aspires to construct a routing optimization method customized for Volvo Powerstrain’s manufacturing plant in Skövde, Sweden. In order to enforce Volvo’s own understanding and control of there own organization, as well as optimize the utilization of the in-house tow trains, the BRO methodology where created. The methodology where created from observations of the currents working environment, analysis of order data as well as a comparison with two similar producing factories. The solution created is limited to be used on in-house tow trains, delivering from a supermarket using milk-runs. It is also adapted, but not limited for use in combination with Kanban and JIT. BRO is a 13-step methodology, divided up into 3 blocks, which utilizes heuristic decision-making and basic resource balancing for laying optimized routes.
Beskrivning
Ämne/nyckelord
Övrig industriell teknik och ekonomi , Hållbar utveckling , Transport , Other industrial engineering and economics , Sustainable Development , Transport
Citation
Arkitekt (konstruktör)
Geografisk plats
Byggnad (typ)
Byggår
Modelltyp
Skala
Teknik / material
Index