Comparing Prescriptive Risk Management Processes against Practice, A case study of Veidekke’s risk management system and procedures

Typ
Examensarbete för masterexamen
Master Thesis
Program
Design and construction project management (MPDCM), MSc
Publicerad
2016
Författare
DAHLSTRÖM, WILLIAM
Liljenhed, Alexander
Modellbyggare
Tidskriftstitel
ISSN
Volymtitel
Utgivare
Sammanfattning
Risk and risk management is part of most industries and companies. Within the construction sector, many projects are unique which makes them complex and influences the time and cost one need to put on risk management. However, risk management within many companies are limited and companies do not always put enough effort on risk management. In collaboration with Veidekke Entreprenad AB, an investigation and benchmark of their current risk management process and the work that their employees carry out will be analysed against prescriptive risk management processes (RMPs). Most definitions of risk management include the aspects of a systematic process. However, this study has shown that the different prescriptive RMPs which has been studied is essentially a refined structure of common sense. Moreover, even if different layouts and names are used, prescriptive RMPs usually include the different phases of planning the RMP, risk identification, risk analysis, plan of risk response, and finally monitor and control of risks. Veidekke’s risk management has a similar setup as the prescriptive RMPs, but it is simpler and the transition between the phases are not as well-defined. During the interviews it was revealed that the interviewees work with risks and risk management, but not fully according to Veidekke´s RMP. Some tools from the RMP are used, but most of the interviewees had their own way of performing the risk management. The work gets done, but maybe not in Veidekke´s intended way. The thesis has also studied the human aspect in the RMP: It can be established that an organization will be depended on the individuals performing the work. Different persons and different groups behave differently, approaches risks differently, and take decisions in different ways. This study has shown that the interviewees vaguely implement Veidekke’s intended RMP. In order to improve Veidekke’s RMP and to make sure the employees can use it, this study has shown that the RMP need to be reformed with a clearer structure, and simplifying the documents which are to be used in the process.
Beskrivning
Ämne/nyckelord
Samhällsbyggnadsteknik , Civil Engineering
Citation
Arkitekt (konstruktör)
Geografisk plats
Byggnad (typ)
Byggår
Modelltyp
Skala
Teknik / material
Index