Reducing Lead Times for Organizations Handling Multiple Projects in an Engineer to Order Environment - A Case Study at Jensen Sweden

Examensarbete för masterexamen

Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.12380/257250
Download file(s):
File Description SizeFormat 
257250.pdfFulltext2 MBAdobe PDFView/Open
Type: Examensarbete för masterexamen
Master Thesis
Title: Reducing Lead Times for Organizations Handling Multiple Projects in an Engineer to Order Environment - A Case Study at Jensen Sweden
Authors: Karlsson, Philip
Garcia Wernersson, Rikard
Keywords: Samhällsbyggnadsteknik;Civil Engineering
Issue Date: 2019
Publisher: Chalmers tekniska högskola / Institutionen för arkitektur och samhällsbyggnadsteknik
Chalmers University of Technology / Department of Architecture and Civil Engineering
URI: https://hdl.handle.net/20.500.12380/257250
Collection:Examensarbeten för masterexamen // Master Theses



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.