Nätnyttomodellen och dess inverkan på ett distributionsnät - En studie i samarbete med Härryda Energi AB

dc.contributor.authorSvensson, Johan
dc.contributor.authorWikerlund, Daniel
dc.contributor.departmentChalmers tekniska högskola / Institutionen för energi och miljösv
dc.contributor.departmentChalmers University of Technology / Department of Energy and Environmenten
dc.date.accessioned2019-07-03T13:07:55Z
dc.date.available2019-07-03T13:07:55Z
dc.date.issued2006
dc.description.abstractThis report is intended to give an insight in the Network Performance Assessment Model and the parameters that is needed in the making of a fictitious grid that represents an optimal grid. A main goal is to investigate how the construction of a real grid is compared to the fictitious. One of the key parameters is how redundancy is treated in the model and to find the optimal amount of redundancy versus the costs. Further is the dimensioning of the grid of interest. The fictitious grid is based on energy whereas the real grid often is based on subscribed power and these two principles are compared and analyzed. The difference in the outcome of the model result due to variations in input data of the model is also discussed in the report.
dc.identifier.urihttps://hdl.handle.net/20.500.12380/174202
dc.language.isoswe
dc.setspec.uppsokLifeEarthScience
dc.subjectElkraftteknik
dc.subjectElectric power engineering
dc.titleNätnyttomodellen och dess inverkan på ett distributionsnät - En studie i samarbete med Härryda Energi AB
dc.type.degreeExamensarbete för masterexamensv
dc.type.degreeMaster Thesisen
dc.type.uppsokH
Ladda ner
Original bundle
Visar 1 - 1 av 1
Hämtar...
Bild (thumbnail)
Namn:
174202.pdf
Storlek:
2.14 MB
Format:
Adobe Portable Document Format
Beskrivning:
Fulltext