Flexibility in planning and operation of sawmill: An investigation of the potential for industrial demand response using MILP cost optimisation models

dc.contributor.authorKjellander, Josefine
dc.contributor.departmentChalmers tekniska högskola / Institutionen för rymd-, geo- och miljövetenskapsv
dc.contributor.examinerOdenberger, Mikael
dc.contributor.supervisorIngvarsson, Simon
dc.date.accessioned2022-06-27T13:38:18Z
dc.date.available2022-06-27T13:38:18Z
dc.date.issued2022sv
dc.date.submitted2020
dc.description.abstractRecent and future development of the electricity system calls for actions to match demand and supply. One action that this thesis investigates is the potential of de mand response within the wood industry. The purpose is to investigate how this can be implemented with strategic planning and operation and what the implications are on both the sawmill and on the electricity system. Efficient representation of the Sawmills has previously been performed with MILP models and is hence chosen as the main tool for this study. Together with four scenarios and data retrieved from industry partners, the study reveals the relation between overcapacity and demand to be determining the potential for flexibility. The results indicate that the chamber kilns are suitable to respond to short peaks (up to a couple of hours) in electricity prices whilst the progressive kilns can be used to manage and smooth variations of longer duration (in the range of 100 hours). The magnitude of the flexible loads are approximate 5-60 kWh/h, which is not significant in the context of the Swedish electricity system. However, if the entire sawmill industry would respond such aggregate response can hav an impact on the electricity market. Further studies are recommended to include an investigation of the tipping-point of the profitability for flexible operation, i.e., what electricity prices or economic stimulation are needed to make the savings of the flexible operation larger than the expenditures.sv
dc.identifier.coursecodeSEEX30sv
dc.identifier.urihttps://hdl.handle.net/20.500.12380/304911
dc.language.isoengsv
dc.setspec.uppsokLifeEarthScience
dc.subjectSawmillsv
dc.subjectFlexibilitysv
dc.subjectMixed Integer Linear Programmingsv
dc.subjectDemand Responsesv
dc.subjectSector Couplingsv
dc.subjectProduction Planningsv
dc.subjectEnergy Systemsv
dc.subjectDrying Kilnsv
dc.subjectElectricitysv
dc.subjectCost Optimisationsv
dc.titleFlexibility in planning and operation of sawmill: An investigation of the potential for industrial demand response using MILP cost optimisation modelssv
dc.type.degreeExamensarbete för masterexamensv
dc.type.uppsokH
local.programmeSustainable energy systems (MPSES), MSc

Ladda ner

Original bundle

Visar 1 - 1 av 1
Hämtar...
Bild (thumbnail)
Namn:
Masters_thesis_Flexibility_in_Planning_and_Operation_of_Sawmills_FinalReport.pdf
Storlek:
1.48 MB
Format:
Adobe Portable Document Format
Beskrivning:

License bundle

Visar 1 - 1 av 1
Hämtar...
Bild (thumbnail)
Namn:
license.txt
Storlek:
1.51 KB
Format:
Item-specific license agreed upon to submission
Beskrivning: