Material flow improvement

dc.contributor.authorBelime, Léo
dc.contributor.departmentChalmers tekniska högskola / Institutionen för material- och tillverkningstekniksv
dc.contributor.departmentChalmers University of Technology / Department of Materials and Manufacturing Technologyen
dc.date.accessioned2019-07-03T12:27:33Z
dc.date.available2019-07-03T12:27:33Z
dc.date.issued2010
dc.description.abstractLouis Vuitton’s workshops and their supply chains are continuously changing in order to meet growth in sales and ever-faster product-life cycles. Organizations evolve and new systems are implemented. In this context, the workshop needs to increase the control over its flow of material. This lack of control results in inappropriate supplies (generating material excess and/or shortages) or losses and wastes of material, which has financial consequences for the workshop. The analysis identified areas of potential improvement and broke down the project into three subjects: improving technical data reliability, defining the process of production ramp-downs and monitoring the performance of the warehouse. Each project started by a period of analysis, followed by proposals, implementation and follow-up. All of them appealed to “change management” practices. The projects brought concrete gains on material control. Bills of material and stock levels are more reliable, production ramp-downs are in control. The main outcomes of the projects are methods: production ramp-downs procedure, raw material quality monitoring, control process monitoring. The control of material flow is now set as a goal for the team, improvements are followed and shared. Thus this project contributed to give the workshop the means to sustain improvements on material flow. Keywords: Material flows, waste reduction, performance indicators
dc.identifier.urihttps://hdl.handle.net/20.500.12380/127812
dc.language.isoeng
dc.relation.ispartofseriesDiploma work - Department of Materials and Manufacturing Technology, Chalmers University of Technology
dc.setspec.uppsokTechnology
dc.subjectProduktion
dc.subjectProduktionsteknik
dc.subjectIndustriell organisation, administration och ekonomi
dc.subjectProduction
dc.subjectManufacturing engineering
dc.subjectIndustrial organisation, administration and economics
dc.titleMaterial flow improvement
dc.type.degreeExamensarbete för masterexamensv
dc.type.degreeMaster Thesisen
dc.type.uppsokH

Ladda ner

Original bundle

Visar 1 - 1 av 1
Hämtar...
Bild (thumbnail)
Namn:
127812.pdf
Storlek:
2.51 MB
Format:
Adobe Portable Document Format
Beskrivning:
Fulltext