Enabling Circular Construction Through Proactive Waste Logistics; The Role of Collaboration and Information Exchange Between Main Contractors and Waste Contractors

dc.contributor.authorJohansson, Selma
dc.contributor.departmentChalmers tekniska högskola / Institutionen för arkitektur och samhällsbyggnadsteknik (ACE)sv
dc.contributor.departmentChalmers tekniska högskola / Institutionen för arkitektur och samhällsbyggnadsteknik (ACE)en
dc.contributor.examinerSundquist, Viktoria
dc.contributor.supervisorAnil Sezer, Ahmet
dc.date.accessioned2026-07-06T11:38:34Z
dc.date.issued2026
dc.date.submitted
dc.description.abstractThe construction sector faces a critical challenge due to its high material consumption and massive waste generation, making the transition toward a circular economy (CE) an operational necessity. While circular principles establish clear targets for closed-loop supply chains, practical execution relies on reverse logistics; the planning and movement of materials from the construction site back into the value chain. However, due to the industry’sfragmented nature, waste management is traditionally treated as a reactive support activity plagued by information silos and poor coordination between main contractors and waste contractors. To explore how this interface can be improved, this qualitative single-case study investigates how collaboration and information exchange can be structured to enable proactive waste logistics. The empirical data was collected through a site observation and nine semi-structured interviews at a school construction project in Gothenburg, Sweden, representing the operational roles of the main contractor as well as strategic regional and national managers from a waste management contractor. The findings identify major structural, organizational, and behavioral barriers on-site, including a lack of forward-looking material prognoses, late order-related communication, and a traditional view of the waste contractor as a passive service provider rather than an integrated logistics partner. Furthermore, the study highlights how centralized project budgeting and intense schedule pressures lead to local sub-optimization, where individual subcontractors lack direct accountability and discard mixed waste fractions into shared containers. To mitigate these challenges, this thesis proposes a comprehensive framework for proactive waste logistics emphasizing early involvement, real-time data transparency, a dedicated on-site logistics manager, and structured visual management. Ultimately, integrating the waste contractor as a strategic partner is concluded to be a fundamental prerequisite for bridging the gap between circular ambitions and the operational reality on the construction site.
dc.identifier.coursecodeACEX30
dc.identifier.urihttps://hdl.handle.net/20.500.12380/311868
dc.language.isoeng
dc.setspec.uppsokTechnology
dc.subjectConstruction Logistics, Waste Logistics, Reverse Logistics, Circular Economy, Closed-Loop Supply Chain, Inter-organisational Collaboration.
dc.titleEnabling Circular Construction Through Proactive Waste Logistics; The Role of Collaboration and Information Exchange Between Main Contractors and Waste Contractors
dc.type.degreeExamensarbete för masterexamensv
dc.type.degreeMaster's Thesisen
dc.type.uppsokH
local.programmeDesign and construction project management (MPDCM), MSc

Ladda ner

Original bundle

Visar 1 - 1 av 1
Hämtar...
Bild (thumbnail)
Namn:
ACEX30 - Selma Johansson.pdf
Size:
1.66 MB
Format:
Adobe Portable Document Format

License bundle

Visar 1 - 1 av 1
Hämtar...
Bild (thumbnail)
Namn:
license.txt
Size:
2.35 KB
Format:
Item-specific license agreed upon to submission
Description: