Standardising an Asset Management Process - A case study of a pier inspection process at the Port of Gothenburg
dc.contributor.author | HALLGREN, JOHANNA | |
dc.contributor.author | OLSSON, RICKARD | |
dc.contributor.department | Chalmers tekniska högskola / Institutionen för bygg- och miljöteknik | sv |
dc.contributor.department | Chalmers University of Technology / Department of Civil and Environmental Engineering | en |
dc.date.accessioned | 2019-07-03T14:20:50Z | |
dc.date.available | 2019-07-03T14:20:50Z | |
dc.date.issued | 2016 | |
dc.description.abstract | This study addresses the desire to standardise a pier inspection process at the Port of Gothenburg. A process is in this report defined as a set of inputs converted into outputs to serve some kind of interest. Through studying the process of a pier inspection at the Port of Gothenburg, suggestions on how to standardise the inspection is developed. The study was conducted as a qualitative case study, with a set of interviews and observations to get a deeper understanding of different angles of the case. Four highlighted advantages were found within process standardisation: improved process performance, improved customer confidence, enhanced readiness and simplified communication. It was found that there has to exist a mutual agreement of what is sought, when developing and implementing a standard. In this study, two different perceptions of a standardised process were identified; a stable process where the responsibilities are clear, and a common nomenclature. The authors address these different perceptions through introducing a flow scheme that will facilitate a common nomenclature and an efficient and proper documentation. Further, a development of the Port’s current data system, with increased compatibility to pier operations, is recommended. For further research it is suggested that the flow scheme is developed in a deeper and more technical approach, and further investigate the compatibility of this standardisation, through an additional case study on another pier. | |
dc.identifier.uri | https://hdl.handle.net/20.500.12380/242449 | |
dc.language.iso | eng | |
dc.relation.ispartofseries | Examensarbete - Institutionen för bygg- och miljöteknik, Chalmers tekniska högskola : BOMX02-16-86 | |
dc.setspec.uppsok | Technology | |
dc.subject | Samhällsbyggnadsteknik | |
dc.subject | Civil Engineering | |
dc.title | Standardising an Asset Management Process - A case study of a pier inspection process at the Port of Gothenburg | |
dc.type.degree | Examensarbete för masterexamen | sv |
dc.type.degree | Master Thesis | en |
dc.type.uppsok | H | |
local.programme | Design and construction project management (MPDCM), MSc |
Ladda ner
Original bundle
1 - 1 av 1
Hämtar...
- Namn:
- 242449.pdf
- Storlek:
- 15.6 MB
- Format:
- Adobe Portable Document Format
- Beskrivning:
- Fulltext