Balansering, simulering och layoutanalys av ett parallellt monteringsflöde till en produktionslinje
Publicerad
Författare
Typ
Examensarbete på grundnivå
Modellbyggare
Tidskriftstitel
ISSN
Volymtitel
Utgivare
Sammanfattning
This study examines how a separate door assembly line can be designed and balanced within an
existing production environment at Volvo Trucks in Tuve. The aim is to develop a concept
proposal that explores possible solutions for an alternative door line, based on production data,
line balancing analysis, and simulations.
To address questions regarding placement area, assembly sequence, capacity, and how production
is affected by disruptions, both a simulation program and a balancing tool have been used. The
study takes into account existing logistics, tasks related to door assembly, and space limitations
within the factory.
Data was collected and used to develop a line balancing proposal for a potential door line. A
simulation model, consisting of stations and buffers, was built and analyzed. The study also
includes a comparison between two possible areas for placing the door line, considering the
factory's layout, flow, and logistical conditions.
The result provides a decision-making basis including a balancing proposal for seven assembly
stations and a simulation model that can be used as a tool to test production changes and carry out
scenario analyses, for example when varying takt times or dealing with disturbances. The goal has
been to design an efficient and compact door line concept that can interact smoothly with the
existing production line