Vad har Götaälvbron för inverkan på trafikflödet av lastfartyg längs Göta älv? En fallstudie av inlandssjöfarten på Göta älv

dc.contributor.authorWibel, Erik
dc.contributor.authorGillkvist, Felix
dc.contributor.departmentChalmers tekniska högskola / Institutionen för sjöfart och marin tekniksv
dc.contributor.departmentChalmers University of Technology / Department of Shipping and Marine Technologyen
dc.date.accessioned2019-07-03T13:32:10Z
dc.date.available2019-07-03T13:32:10Z
dc.date.issued2014
dc.description.abstractSince the proposal of a new bridge was presented, as a part of “Västlänken” and for the 200 year anniversary for the city of Gothenburg, the opinions about the design and construction of the bridge have varied. If they decide to build a bridge with a height of 13 meters, all of the cargo ships in the future will depend on several bridge openings, a problem that eventually will result in restrictions both for land and sea transports. The community of Gothenburg has promised the shipping industry 15 bridge openings per day. After the community conducted several studies concerning the quantity of goods they have come to the conclusion that 15 bridge openings per day will not be necessary. The shipping industry on the other hand emphasizes that the EU-commissions directives, concerning inland waterways, will help them prosper but the new bridge will only develop problems which will make their customers start to consider other alternatives. At the same time there is an ongoing debate about the railway departures and arrivals in Gothenburg where administration is dealing with capacity problems. The shipping industry is also worried that a result of the population’s lack of patience will generate less bridge openings in the future. The consequences will not be in favor of the shipping industry. The choice of resource method is based on the editor’s choice of research questions. These questions have been redefined as the knowledge has increased. Through these questions the purpose of the project has been reached. To give the reader a clearer view of the overall situation, the editors has categorized the project based on five different areas of subject. Based on the gathered material the editors have come to the conclusion that the conflict and discussion concerning the bridge does not have a single solution. It is hard to take all parties thoughts into consideration. Factors that have to be considered when taking such decisions may vary from price, design, costs, interests and more. It is very important not to limit the possibilities of the future for parties that are dependent on the shipping industry. This is a very complex question that creates an unnecessary conflict between two interests that varies from each other but are still dependent on each other.
dc.identifier.urihttps://hdl.handle.net/20.500.12380/204114
dc.language.isoswe
dc.setspec.uppsokTechnology
dc.subjectAnnan teknik
dc.subjectTransport
dc.subjectOther Engineering and Technologies
dc.subjectTransport
dc.titleVad har Götaälvbron för inverkan på trafikflödet av lastfartyg längs Göta älv? En fallstudie av inlandssjöfarten på Göta älv
dc.type.degreeExamensarbete för kandidatexamensv
dc.type.degreeBachelor Thesisen
dc.type.uppsokM2
local.programmeSjöfart och logistik (180 hp)

Ladda ner