Överföring av och beräkning med timmätta värden – från MT2000 till Xpower

Publicerad

Typ

Examensarbete för masterexamen
Master Thesis

Program

Modellbyggare

Tidskriftstitel

ISSN

Volymtitel

Utgivare

Sammanfattning

New technology makes it possible to remotely measure all consumers in a power network on an hourly basis and store the values in a database. This thesis work describes the conversion process between automatic meter reading system MActor and calculation software Xpower. Then the possible differences between calculations of power networks using load curves in combination with a yearly estimate of consumption and calculations using hourly measured values is examined. The result of the comparison shows that, for the power network under inspection, no significant difference could be noticed. This does not mean that calculations using hourly measured values would be unnecessary. I believe that in a near future calculations using hour measurements will be the primary choice for many power companies to whom technology is available. Also some basic calculations of fundamental power network parameters, such as power factor and loses, are presented using hourly measured distribution transformers in combinations with its hourly measured loads. The report is written in Swedish

Beskrivning

Ämne/nyckelord

Elkraftteknik, Electric power engineering

Citation

Arkitekt (konstruktör)

Geografisk plats

Byggnad (typ)

Byggår

Modelltyp

Skala

Teknik / material

Index

item.page.endorsement

item.page.review

item.page.supplemented

item.page.referenced