Överföring av och beräkning med timmätta värden – från MT2000 till Xpower

Loading...
Thumbnail Image

Date

Type

Examensarbete för masterexamen
Master Thesis

Programme

Model builders

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

New technology makes it possible to remotely measure all consumers in a power network on an hourly basis and store the values in a database. This thesis work describes the conversion process between automatic meter reading system MActor and calculation software Xpower. Then the possible differences between calculations of power networks using load curves in combination with a yearly estimate of consumption and calculations using hourly measured values is examined. The result of the comparison shows that, for the power network under inspection, no significant difference could be noticed. This does not mean that calculations using hourly measured values would be unnecessary. I believe that in a near future calculations using hour measurements will be the primary choice for many power companies to whom technology is available. Also some basic calculations of fundamental power network parameters, such as power factor and loses, are presented using hourly measured distribution transformers in combinations with its hourly measured loads. The report is written in Swedish

Description

Keywords

Elkraftteknik, Electric power engineering

Citation

Architect

Location

Type of building

Build Year

Model type

Scale

Material / technology

Index

Endorsement

Review

Supplemented By

Referenced By