Power production from excess heat in a district heating system

dc.contributor.authorWinther, Jonathan
dc.contributor.departmentChalmers tekniska högskola / Institutionen för arkitektur och samhällsbyggnadstekniksv
dc.contributor.departmentChalmers University of Technology / Department of Architecture and Civil Engineeringen
dc.date.accessioned2019-07-03T14:50:09Z
dc.date.available2019-07-03T14:50:09Z
dc.date.issued2018
dc.description.abstractGöteborg Energi is contemplating whether excess heat in the district heating (DH)system of Gothenburg can be used to produce electrical power. An ORC solution for electric power production is sought and a handful of options are found. Through an elimination process only one solution remains; an ORC-based heat engine from the company ClimeOn. The heat from the cold side of the ORC machine is stored in a seasonal borehole thermal energy storage (BTES) system. The specifications of the district heating system such as temperatures and flow rates are collected and investigated as well as relevant weather data. A base case is set up as a reference case for comparing the results. A BTES is designed and simulated as well. The placement of the ORC machine within the district heating system of Gothenburg is determined and the power production is also calculated. A sensitivity analysis with different temperatures and flow rates is also carried out and presented. Five other cases are set up from the sensitivity analysis. A life cost analysis is done on all the cases. Three different electricity prices are investigated; 85 SEK/MWh (low), 282.5 SEK/MWh (mean) and 448.4 SEK/MWh (high). The results show that when operating seasonally between May-September the net present value (NPV) is not favourable. However, in Case 5 where an all-year operation is assumed, the NPV is positive if the electricity price is average or above average. A payback period of 10 and 28 years is achieved when considering a high and average electricity price respectively.
dc.identifier.urihttps://hdl.handle.net/20.500.12380/255707
dc.language.isoeng
dc.setspec.uppsokTechnology
dc.subjectAnnan samhällsbyggnadsteknik
dc.subjectHållbar utveckling
dc.subjectEnergi
dc.subjectInnovation och entreprenörskap (nyttiggörande)
dc.subjectOther Civil Engineering
dc.subjectSustainable Development
dc.subjectEnergy
dc.subjectInnovation & Entrepreneurship
dc.titlePower production from excess heat in a district heating system
dc.type.degreeExamensarbete för masterexamensv
dc.type.degreeMaster Thesisen
dc.type.uppsokH
local.programmeSustainable energy systems (MPSES), MSc
Ladda ner
Original bundle
Visar 1 - 1 av 1
Hämtar...
Bild (thumbnail)
Namn:
255707.pdf
Storlek:
2.64 MB
Format:
Adobe Portable Document Format
Beskrivning:
Fulltext