Dual Taps on Transformer Bushings
Publicerad
Författare
Typ
Examensarbete för masterexamen
Master's Thesis
Master's Thesis
Modellbyggare
Tidskriftstitel
ISSN
Volymtitel
Utgivare
Sammanfattning
In power systems, High Voltage (HV) bushings play a major role in preventing major
transformer failures or any unplanned outages in the network. It conducts current
through a wall or a grounded steel tank of a transformer. According to the statistics,
bushing failure is one of the major causes for the transformer failure, accounting
for 15-30%. Therefore, it brings greater importance to monitor the condition of the
bushing through an online monitoring system continuously. Also, the condition of
the bushing is monitored periodically by manual testing after taking the bushing
out of service. In Hitachi Energy Sweden AB, the bushings are provided with a
single tap configuration, either a test tap or a voltage tap, to connect the online
monitoring system or the offline equipment during manual testing. The customer
needs to disconnect the online monitoring system to perform manual (offline) testing.
The process of connecting and disconnecting the online measuring system is timeconsuming
and poses safety issues to the testing personnel. The goal of this thesis
work is to develop a dual tap configuration that allows the customer to perform
offline and online measurements in parallel.
To develop the intended dual tap configuration, the primary step was to analyze
the feasibility of the possible configurations, followed by generating concepts that
fulfill the desired functionality. Once the concepts were generated through functional
analysis and morphological matrix, the next step was to screen the concepts through
elimination matrix, Pugh matrix, and Kesselring matrix, resulting in finalizing the
concept. Finally, the chosen concept was developed into a digital prototype that
serves the intended functionality.
Beskrivning
Ämne/nyckelord
Test Tap, Voltage Tap, Online Bushing Monitoring System, Capacitance