Drilled piles are used as rock supports for deep excavations where passive resis tance is insufficient due to proximity to bedrock. Conventional methods primarily
include the use of rock dowels; however, there is growing industry interest in
adapting drilled piles as a primary alternative rather than just a backup. Avail able design methods in standards and guidelines do not adequately address the
forces that occur in the bedrock, especially when gaps exist between the sheet pile
wall and the bedrock due to uneven levels or obstacles that hinder the sheet pile.
This thesis aims to investigates how varying horizontal and vertical gaps between
the sheet pile and bedrock affect the structural behavior of drilled piles acting as
supports. Numerical simulations in PLAXIS 2D were performed using data from
the Sahlgrenska Life project, and interviews were conducted to provide further
insight into the installation processes.
The results show that the horizontal distance, b2, between the sheet pile and drilled
pile contributes to minimal changes in forces within the two structures. For the
vertical gap, b1, between the toe of the sheet pile and the bedrock, the drilled
pile exhibits an increase in shear force as the gap increases, while the bending
moment remains relatively unaffected. However, this applies only to cases where
redistributed net earth pressure remains low. For cases with higher redistributed
earth pressure, the bending moment increases with a gradient of approximately
3·b1, whereas the shear force remains relatively unchanged. This indicates that the
conventional design method for rock dowels does not show the same correlation
between design shear force Qed and design bending moment Med. Variations in toe
modeling were also examined, concluding that modeling the drilled pile as close
to realistic conditions as possible resulted in unrealistic shear forces within the
drilled pile. This is assumed to be caused by numerical point loading effects due
to the significant stiffness contrast between the soil layer and the bedrock.
Beskrivning
Ämne/nyckelord
Geotechnics, Geotechnical construction, Finite element method, PLAXIS 2D, Rock anchors, Anchor methods, Sheet pile wall, Drilled piles, Retaining structures